Contractual entitlement– What does the Contract state regarding entitlement? Contractual Compliance– What does the Contract state in terms of the requirement for notices and the particulars to be provided?
BIM FORENSIC ANALYSIS
ʻʻ
Through our BIM forensic analysis we adhere to the principle that a good forensic engineering expert is a detective. Moreover, one who patiently searches for evidence and reconstructs events.
”
FORENSIC ANALYSIS
Claims Main Process
-
Capture
A claim is captured on the construction site using a mobile device with a simplified user interface.
-
Add Information
In the project office the minimal claim data is extended to contain all of the required information.
-
Determine Project Plan Impact
Impact on project plan timeline is determined based on the resolution time estimate given in the claim.
-
Evaluate Contract
The relevant contract parts are evaluated to understand the contractual impact of the claim.
-
Recommended Action
Based on all available information the project manager makes a recommendation for the project steering board how to handle the claim.
-
Decide On Action
The project steering board members approve or reject the proposed actions.
BIM Claims Management
BIM Forensic Analysis is an extended services of IBIMS’s BIM Oriented PM. Basically, Delay and Disruption is a common occurrence in construction projects. Similarly, the challenges of forensic schedule analysis and the evaluation of the extent of project delay increase with the degree of complexity of a project.
Further more, IBIMS is highly experienced in the preparation of Extension of Time Claims. Hence, whether it is required for defending delay costs or promoting delay and disruption claims, it is essential that the claim reaches the highest standard possible by the level of information available.
Our BIM Forensic Analysis Approach
Our approach depends on linking figure information, which is planning information, and non-figure information, which is construction information. As well as a BIM-based database system for construction information, in order to facilitate effective accumulation of construction information and enhanced information management.
Consequently our role is to identify the relevant facts from the great quantities of data simulated in the 4D model. Moreover support the findings of entitlement, causation and resulting damages.
WHAT IS INCLUDED
Including reference to the Relevant Event provision in the Contract, and Is it neutral or does the responsibility rest with one of the parties? What does the
Contract state in terms of liability?
We produce narratives which include details of the planned works affected. Moreover referring to the planned sequence, duration, and methodology. In addition the status of the works in relation to that planned at the time of the event; and, description of the changes to that plan as a consequence of the event.